paperporterPDF tools
Permit forms
DocsSign inConnect your assistant

Roofing permits: official forms by city

Reroof applications and questionnaires for roof replacement work. Below are 7 official forms across 7 cities, counties and states, each filled in its original layout.

Campbell, CA

Cotati, CA

Danville, CA

Pleasanton, CA

San Anselmo, CA

Sebastopol, CA

Tiburon, CA

Information to prepare

Gather the building address, existing and proposed roofing materials, approximate roof area, and facts about solar panels or other features affected by the work. Do not assume that every roof replacement has the same requirements. Product specifications, structural questions, or installation details may need separate review by the issuing office.

Existing roof and proposed roof are different answers

A reroof questionnaire can ask separately about the material on the building today and the material proposed for the replacement. Check both questions rather than copying one selection into the other. If the printed group says check one, select the option that accurately represents that part of the project. If your material is not listed or you are unsure how to describe it, ask the permit office or responsible contractor instead of selecting the nearest-sounding option.

Measure the scope the form asks about

Use the units and scope printed in the questionnaire. A requested area of new roofing is not necessarily the total floor area of the house. The form may distinguish an overlay from removal and replacement, or ask for facts affecting the assembly. Read those questions together with the proposed work. PaperPorter validates the mapped answer type, but it does not verify measurements or determine whether the proposed roofing assembly is suitable for the structure.

Solar panels and related work need their own review

Existing solar panels can affect the answers to a reroof questionnaire. Identify whether panels are present and which follow-up questions apply to the project. A yes or no answer may lead to a request for additional company or license information. Keep the facts consistent with the planned work and the responsible parties. Do not treat completing the questionnaire as approval for solar, electrical, structural, or other work associated with the roof replacement.

Check product and installation information

The issuer’s printed instructions can request supporting roofing product information or details about the proposed installation. Gather what the office asks for and coordinate it with the person preparing the work. The PDF answers are only part of that package. If the instructions mention manufacturer information or an additional permit for related work, follow up with the office. PaperPorter does not produce specifications or certify that an installation meets the applicable building requirements.

Review your reroof PDF before the next step

Open the filled file and check the building address, existing and proposed choices, area, and every follow-up answer. Inspect both pages rather than stopping at the first visible checkbox group. Leave signatures and staff sections for the appropriate person. If the questionnaire is supplemental to a general application, keep its scope consistent with that application. Save your reviewed output and consult the issuing office’s current process before scheduling or beginning work.