2025 California Green Building Form - Non Residential (Gilroy, California)
This is the official 2025 California Green Building Form - Non Residential from City of Gilroy. You can fill it in its original layout in your browser or with an AI assistant, then download it to review, sign and submit to the agency.
Form details
- Issuer
- City of Gilroy
- Jurisdiction
- Gilroy, California
- Type
- Building permits
- Questions
- 182
- Last mapping review
- 2026-10-01
Official blank PDF from City of Gilroy ↗
What this form asks
- Permit Number
- Project Address
- Project Description
- Storm water pollution prevention. Newly constructed projects and additions which: Project request (Column A) (checkbox)
- 5.106.1 Stormwater pollution prevention for projects that disturb < 1 acre of: Project request (Column A) (checkbox)
- 5.106.2 Stormwater pollution prevention for projects that disturb ≥ 1 acres of: Project request (Column A) (checkbox)
- 5.106.4.1.1 Short-term bicycle parking. If the new project or an addition or: Project request (Column A) (checkbox)
- 5.106.4.1.2 Long-term bicycle parking. Acceptable bicycle parking facility for: Project request (Column A) (checkbox)
- Storm water pollution prevention. Newly constructed projects and additions which: Verification (Column B) (checkbox)
- 5.106.1 Stormwater pollution prevention for projects that disturb < 1 acre of: Verification (Column B) (checkbox)
- 5.106.2 Stormwater pollution prevention for projects that disturb ≥ 1 acres of: Verification (Column B) (checkbox)
- 5.106.4.1.1 Short-term bicycle parking. If the new project or an addition or: Verification (Column B) (checkbox)
- 5.106.4.1.2 Long-term bicycle parking. Acceptable bicycle parking facility for: Verification (Column B) (checkbox)
- 5.106.5.3 Electric vehicle (EV) charging. Construction to provide electric vehicle: Project request (Column A) (checkbox)
- 5.106.5.3.1 EV capable spaces. EV capable spaces shall be provided in: Project request (Column A) (checkbox)
- 5.106.5.3.2 Electric vehicle charging stations (EVCS). EV capable spaces shall: Project request (Column A) (checkbox)
- 5.106.5.3 Electric vehicle (EV) charging. Construction to provide electric vehicle: Verification (Column B) (checkbox)
- 5.106.5.3.1 EV capable spaces. EV capable spaces shall be provided in: Verification (Column B) (checkbox)
- 5.106.5.3.2 Electric vehicle charging stations (EVCS). EV capable spaces shall: Verification (Column B) (checkbox)
- 5.106.5.3.3 Use of automatic load management systems (ALMS). ALMS shall be: Project request (Column A) (checkbox)
- 5.106.5.3.4 Accessible electric vehicle charging station (EVCS). When EVSE is: Project request (Column A) (checkbox)
- 5.106.5.3.5 Electric vehicle charging station signage. Electric vehicle charging: Project request (Column A) (checkbox)
- 5.106.5.3.6 Electric vehicle charging stations (EVCS): power allocation: Project request (Column A) (checkbox)
- Identification. [N] The service panel or subpanel(s) circuit directory shall identify: Project request (Column A) (checkbox)
- 5.106.5.3.3 Use of automatic load management systems (ALMS). ALMS shall be: Verification (Column B) (checkbox)
- 5.106.5.3.4 Accessible electric vehicle charging station (EVCS). When EVSE is: Verification (Column B) (checkbox)
- 5.106.5.3.5 Electric vehicle charging station signage. Electric vehicle charging: Verification (Column B) (checkbox)
- 5.106.5.3.6 Electric vehicle charging stations (EVCS): power allocation: Verification (Column B) (checkbox)
- Identification. [N] The service panel or subpanel(s) circuit directory shall identify: Verification (Column B) (checkbox)
- 5.106.5.4 Additions or alterations to existing buildings or parking facilities [A].: Project request (Column A) (checkbox)
- 5.106.5.5 Electric vehicle (EV) charging: medium-duty and heavy-duty. [N]: Project request (Column A) (checkbox)
- 5.106.5.4 Additions or alterations to existing buildings or parking facilities [A].: Verification (Column B) (checkbox)
- 5.106.5.5 Electric vehicle (EV) charging: medium-duty and heavy-duty. [N]: Verification (Column B) (checkbox)
- 5.106.8 Light pollution reduction [N]. Outdoor lighting systems shall be designed: Project request (Column A) (checkbox)
- 5.106.8 Light pollution reduction [N]. Outdoor lighting systems shall be designed: Verification (Column B) (checkbox)
- Grading and paving. Construction plans shall indicate how site grading or a: Project request (Column A) (checkbox)
- 5.201.1 Scope Compliance with the California Energy Commission mandatory: Project request (Column A) (checkbox)
- 5.303.1.1 New buildings or additions in excess of 50,000 square feet.: Project request (Column A) (checkbox)
- Excess consumption: A separate submeter or metering device shall be provided: Project request (Column A) (checkbox)
- 5.303.3.1 Water closets. The effective flush volume of all water closets shall not: Project request (Column A) (checkbox)
- 5.303.3.2.1 Wall-mounted urinals. The effective flush volume of wall-mounted: Project request (Column A) (checkbox)
- Grading and paving. Construction plans shall indicate how site grading or a: Verification (Column B) (checkbox)
- 5.201.1 Scope Compliance with the California Energy Commission mandatory: Verification (Column B) (checkbox)
- 5.303.1.1 New buildings or additions in excess of 50,000 square feet.: Verification (Column B) (checkbox)
- Excess consumption: A separate submeter or metering device shall be provided: Verification (Column B) (checkbox)
- 5.303.3.1 Water closets. The effective flush volume of all water closets shall not: Verification (Column B) (checkbox)
- 5.303.3.2.1 Wall-mounted urinals. The effective flush volume of wall-mounted: Verification (Column B) (checkbox)
- 5.303.3.3.1 Single showerhead. Showerheads shall have a maximum flow rate of: Project request (Column A) (checkbox)
- Multiple showerheads Serving One Shower: When a shower is served by more: Project request (Column A) (checkbox)
- 5.303.3.4.1 Nonresidential lavatory faucets. Lavatory faucets shall have a: Project request (Column A) (checkbox)
- 5.304.1 Outdoor potable water use in landscape areas. Nonresidential: Project request (Column A) (checkbox)
- 1. Outdoor water use in landscape areas of 2500 sq. ft. or less. Comply with: Project request (Column A) (checkbox)
- 5.407.1 Weather protection. Provide a weather-resistant exterior wall and: Project request (Column A) (checkbox)
- 5.407.2.1 Sprinklers. Design and maintain landscape irrigation systems to prevent: Project request (Column A) (checkbox)
- 5.407.2.2.1 Exterior door protection. Primary exterior entries shall be covered to: Project request (Column A) (checkbox)
- 5.303.3.3.1 Single showerhead. Showerheads shall have a maximum flow rate of: Verification (Column B) (checkbox)
- Multiple showerheads Serving One Shower: When a shower is served by more: Verification (Column B) (checkbox)
- 5.303.3.4.1 Nonresidential lavatory faucets. Lavatory faucets shall have a: Verification (Column B) (checkbox)
- 5.304.1 Outdoor potable water use in landscape areas. Nonresidential: Verification (Column B) (checkbox)
- 1. Outdoor water use in landscape areas of 2500 sq. ft. or less. Comply with: Verification (Column B) (checkbox)
- 5.407.1 Weather protection. Provide a weather-resistant exterior wall and: Verification (Column B) (checkbox)
- 5.407.2.1 Sprinklers. Design and maintain landscape irrigation systems to prevent: Verification (Column B) (checkbox)
- 5.407.2.2.1 Exterior door protection. Primary exterior entries shall be covered to: Verification (Column B) (checkbox)
- 5.408.1 Construction waste management: Recycle and/or salvage for reuse a: Project request (Column A) (checkbox)
- 5.408.1.2 Waste management company. Utilize a waste management company: Project request (Column A) (checkbox)
- 5.408.1.4 Documentation. Documentation shall be provided to the enforcing agency: Project request (Column A) (checkbox)
- 5.408.2 Universal waste. Additions and alterations to a building or tenant space: Project request (Column A) (checkbox)
- 5.408.3 Excavated soil and land clearing debris. 100 percent of trees, stumps,: Project request (Column A) (checkbox)
- 5.409.1 Life Cycle Assessment Scope. Projects consisting of newly constructed: Project request (Column A) (checkbox)
- 5.408.1 Construction waste management: Recycle and/or salvage for reuse a: Verification (Column B) (checkbox)
- 5.408.1.2 Waste management company. Utilize a waste management company: Verification (Column B) (checkbox)
- 5.408.1.4 Documentation. Documentation shall be provided to the enforcing agency: Verification (Column B) (checkbox)
- 5.408.2 Universal waste. Additions and alterations to a building or tenant space: Verification (Column B) (checkbox)
- 5.408.3 Excavated soil and land clearing debris. 100 percent of trees, stumps,: Verification (Column B) (checkbox)
- 5.409.1 Life Cycle Assessment Scope. Projects consisting of newly constructed: Verification (Column B) (checkbox)
- 5.409.2 Whole building life cycle assessment. Projects shall conduct a cradle-to-: Project request (Column A) (checkbox)
- 5.409.3 Product GWP compliance: prescriptive path. Each product that is: Project request (Column A) (checkbox)
- 5.409.2 Whole building life cycle assessment. Projects shall conduct a cradle-to-: Verification (Column B) (checkbox)
- 5.409.3 Product GWP compliance: prescriptive path. Each product that is: Verification (Column B) (checkbox)
- 5.410.1 Recycling by occupants. Provide readily accessible areas that serve the: Project request (Column A) (checkbox)
- 5.410.1.1 Additions. All additions conducted within a 12-month period under single: Project request (Column A) (checkbox)
- 5.410.1.2 Sample ordinance. Space allocation for recycling areas shall comply with: Project request (Column A) (checkbox)
- 5.410.2 Commissioning. [N] New buildings 10,000 square feet and over. For new: Project request (Column A) (checkbox)
- 5.410.1 Recycling by occupants. Provide readily accessible areas that serve the: Verification (Column B) (checkbox)
- 5.410.1.1 Additions. All additions conducted within a 12-month period under single: Verification (Column B) (checkbox)
- 5.410.1.2 Sample ordinance. Space allocation for recycling areas shall comply with: Verification (Column B) (checkbox)
- 5.410.2 Commissioning. [N] New buildings 10,000 square feet and over. For new: Verification (Column B) (checkbox)
- 5.410.2.1 Owner’s or Owner representative’s Project Requirements (OPR) [N].: Project request (Column A) (checkbox)
- 5.410.2.2 Basis of Design (BOD) [N]. A written explanation of how the design of: Project request (Column A) (checkbox)
- 5.410.2.3 Commissioning plan [N]. Prior to permit issuance a commissioning plan: Project request (Column A) (checkbox)
- 5.410.2.4 Functional performance testing. Functional performance tests shall: Project request (Column A) (checkbox)
- 5.410.2.5 Documentation and training [N]. A systems manual and systems: Project request (Column A) (checkbox)
- 5.410.2.1 Owner’s or Owner representative’s Project Requirements (OPR) [N].: Verification (Column B) (checkbox)
- 5.410.2.2 Basis of Design (BOD) [N]. A written explanation of how the design of: Verification (Column B) (checkbox)
- 5.410.2.3 Commissioning plan [N]. Prior to permit issuance a commissioning plan: Verification (Column B) (checkbox)
- 5.410.2.4 Functional performance testing. Functional performance tests shall: Verification (Column B) (checkbox)
- 5.410.2.5 Documentation and training [N]. A systems manual and systems: Verification (Column B) (checkbox)
- 5.410.2.5.1 Systems manual [N]. Documentation of the operational aspects of the: Project request (Column A) (checkbox)
- 5.410.2.5.2 Systems operations training [N]. A program for training of the: Project request (Column A) (checkbox)
- 5.410.2.6 Commissioning report [N]. A report of commissioning process activities: Project request (Column A) (checkbox)
- 5.410.4 Testing and adjusting: Testing and adjusting of systems shall be required: Project request (Column A) (checkbox)
- 5.410.4.2 Systems: Develop a written plan of procedures for testing and adjusting: Project request (Column A) (checkbox)
- 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance: Project request (Column A) (checkbox)
- 5.410.4.3.1 HVAC balancing. Before a new space-conditioning system serving a: Project request (Column A) (checkbox)
- 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide: Project request (Column A) (checkbox)
- 5.410.4.5 Operation and maintenance (O & M) manual. Provide the building: Project request (Column A) (checkbox)
- 5.410.4.5.1 Inspections and reports. Include a copy of all inspection verifications: Project request (Column A) (checkbox)
- 5.410.2.5.1 Systems manual [N]. Documentation of the operational aspects of the: Verification (Column B) (checkbox)
- 5.410.2.5.2 Systems operations training [N]. A program for training of the: Verification (Column B) (checkbox)
- 5.410.2.6 Commissioning report [N]. A report of commissioning process activities: Verification (Column B) (checkbox)
- 5.410.4 Testing and adjusting: Testing and adjusting of systems shall be required: Verification (Column B) (checkbox)
- 5.410.4.2 Systems: Develop a written plan of procedures for testing and adjusting: Verification (Column B) (checkbox)
- 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance: Verification (Column B) (checkbox)
- 5.410.4.3.1 HVAC balancing. Before a new space-conditioning system serving a: Verification (Column B) (checkbox)
- 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide: Verification (Column B) (checkbox)
- 5.410.4.5 Operation and maintenance (O & M) manual. Provide the building: Verification (Column B) (checkbox)
- 5.410.4.5.1 Inspections and reports. Include a copy of all inspection verifications: Verification (Column B) (checkbox)
- 5.503.1 Fireplaces. Install only a direct-vent sealed or pellet stove. Any installed: Project request (Column A) (checkbox)
- 5.504.1 Temporary ventilation. The permanent HVAC system shall only be used: Project request (Column A) (checkbox)
- 5.504.3 Covering of duct openings and protection of mechanical equipment: Project request (Column A) (checkbox)
…and 62 more.
Review, sign and submit
PaperPorter fills the form but does not submit it or approve anything. Signatures, initials and staff-only areas are left for the right person. Confirm current fees, attachments and filing instructions with City of Gilroy.
Building permits in other places
- SAF Permit Application American Canyon
- Building Permit Application Antioch
- Solicitor Permit Application Concord
- Special Inspection and Observation Program form Concord
- Construction and Demolition Recycling Form Corte Madera
- Building Permit and Development Fees Estimate Request Form Cotati
- Building Permit Application Daly City
- Building permit application Danville
Frequently asked questions
Does PaperPorter submit this form?
No. You download the completed PDF, then review, sign and submit it to City of Gilroy yourself.
Can I fill it without an AI assistant?
Yes. Fill it in your browser and download the completed PDF. An assistant such as ChatGPT or Claude can also ask you the questions and fill it for you.